BMB ~ Bethel July 22 thru 24 2008


Phil McConnell installing light switches
Phil McConnell installing light switches
7/22/2008
Nancy Hembree Cutting in for painters
Nancy Hembree Cutting in for painters
7/22/2008
Margaret Knight Cutting in at molding
Margaret Knight Cutting in at molding
7/22/2008
Cauking the molding
Cauking the molding
7/22/2008
Installing slats for ceiling
Installing slats for ceiling
7/23/2008
Calking
Calking
7/23/2008
Installing plumbing fixtures
Installing plumbing fixtures
7/24/2008
Tight fit under sink
Tight fit under sink
7/24/2008
Painting around the lightsl
Painting around the lightsl
7/24/2008
The lights were a change in the plans Painting around them
The lights were a change in the plans Painting around them
7/24/2008
Cutting molding
Cutting molding
7/24/2008
Making the work move along
Making the work move along
7/24/2008
Ham with the camera
Ham with the camera
7/24/2008
Keeping ahead of the trim workers
Keeping ahead of the trim workers
7/24/2008
Planning to step in the paint!
Planning to step in the paint!
7/24/2008
The mother hen ~ Keeping the teens working
The mother hen ~ Keeping the teens working
7/24/2008
Walt on the prowl
Walt on the prowl
7/24/2008
Plumbing installation
Plumbing installation
7/24/2008
Half pillers in the hall
Half pillers in the hall
7/24/2008
Trim work
Trim work
7/24/2008
Cutting in the final coat ~ Installing door
Cutting in the final coat ~ Installing door
7/24/2008
Putting on the final touches
Putting on the final touches
7/24/2008
Looking good
Looking good
7/24/2008
Joel does outside siding
Joel does outside siding
7/24/2008
Fast worker
Fast worker
7/24/2008
Moving the ladder
Moving the ladder
7/24/2008
Painting the ceiling
Painting the ceiling
7/24/2008
Painting siding
Painting siding
7/24/2008
Team Work
Team Work
7/24/2008
Keeping the trash out of the way
Keeping the trash out of the way
7/24/2008
Walt the trash man!
Walt the trash man!
7/24/2008