|
|
Installing Ceiling in the drive thru
|
|
7/25/2008
|
|
|
|
Cutting in at the molding
|
|
7/25/2008
|
|
|
|
Cutting in at the molding
|
|
7/25/2008
|
|
|
|
Final coat on the ceiling
|
|
7/25/2008
|
|
|
|
Making stalls for the ladies restroom
|
|
7/25/2008
|
|
|
|
Completed hall with half columns
|
|
7/25/2008
|
|
|
|
Classroom hall
|
|
7/25/2008
|
|
|
|
Painting trim
|
|
7/25/2008
|
|
|
|
Dinning room with final coat
|
|
7/25/2008
|
|
|
|
Touching up the ceiling
|
|
7/25/2008
|
|
|
|
Looking good
|
|
7/25/2008
|
|
|
|
Cutting ceiling tiles for drive through
|
|
7/25/2008
|
|
|
|
Walt on the DeWalt cutting ceiling tiles
|
|
7/25/2008
|
|
|
|
Keeping up with Walt
|
|
7/25/2008
|
|
|
|
Painting the outside trim
|
|
7/25/2008
|
|
|
|
Final touches
|
|
7/25/2008
|
|
|
|
The Teen's were great
|
|
7/25/2008
|
|
|
|
Last minute cutting in
|
|
7/25/2008
|
|
|
|
Final touchup
|
|
7/25/2008
|
|
|
|
Ready to board the bus for the trip home!
|
|
7/25/2008
|
|
|